- This event has passed.
August 9, 2023 - August 31, 2023
The lower level of the church will feel a bit like a construction zone this month. We will be repairing the back parking lot and re-flooring some of our lower-level spaces. During this time, please follow posted signage and refrain from parking in coned off areas.
During this season, our office entrance will temporarily move to Entrance I. Upon entering, you can reach the reception area through the hallway to your right. A map of the construction zone, and alternate routes / parking locations is available at calvarygr.org/construction.
Thank you for your patience as this needed work takes place.